Realistic, Scoping-Based Timeline Estimates
Recommended project timelines were based on best-case scenarios rather than the customer's actual scope, leading to unrealistic expectations and excessive workload for customers trying to meet the estimated deadline.
Proposed Solutions:
Generate timeline estimates from a scoping/maturity assessment rather than best-case anecdotes.
Factor in cross-team dependencies (e.g., IT availability) into the estimate.
Present a realistic range (not a single best-case number) upfront during sign-up/scoping.
Acceptance Criteria:
Timeline estimates are generated based on assessment inputs specific to the customer, not a fixed best-case figure.
Cross-team dependency factors are included as inputs to the estimate.
Customers are shown a range rather than a single-point estimate before committing to a timeline.